Here's the latest news from Camden's Head of Engineering:
My
colleague has been monitoring the works by Thames Water at the West
End Lane junction with Cleve Road. The leak has been repaired and the
reinstatement of the carriageway by Thames Water contractors has just been
completed.
Following
a two hour curing time on this reinstatement the temporary traffic lights will
be removed and the road returned to normal signalling.
The
Cleve Road is expected to be fully operational by 6.30pm this evening.
No comments:
Post a Comment